Field documentation
Roofing Photo Checklist: Before, During and After the Job
Take a baseline set before work, document details while they are still visible, and match those locations in the final set. Give every photo a roof area and stage so the office can find it without calling the crew back.
See the sample photo registerBefore: capture the baseline
- Take an overview from each safely visible elevation and label the roof planes on the project sketch.
- Capture existing conditions in the work area: gutters, siding, fascia, accessible flashings and nearby items that could be affected. Pair each detail with an image that shows where it sits.
- Record the project ID and date. Note any roof plane that could not be photographed and why.
During: capture details before they are covered
- Agree with the crew lead on photo checkpoints before tear-off. Photograph exposed conditions and relevant installation details while visible, such as an opened wall transition or a valley detail in scope.
- For each exception, take a location view and a detail view from a safe, authorized position. If the finding changes the work, link the photos to the affected scope item and the approval record. Follow the separate hidden decking damage workflow when the crew uncovers damaged decking.
- Mark unavailable shots as missing with the reason. A photo record does not replace a required inspection; verify separately what the project or permit requires.
After: match views and check the set
Repeat the baseline angles where practical. Record visible finished details and site cleanup. Before handing off the set, check that key images are readable, assigned to the correct job and paired with their earlier views. Keep original files in a restricted project folder and share only approved copies; avoid unrelated personal details in the frame.
Sample photo register: one wall transition
Fictional project RF-271, north roof plane, wall transition N1. Use one entry per image and keep the original filename mapped to the photo ID.
- N1-B01 · Before
- Wide view from the driveway showing which wall meets the north roof plane.
- N1-D01 / N1-D02 · During
- Location and detail views while the transition is exposed. Both entries reference scope item 04.
- N1-A01 · After
- Finished view matched to N1-B01. Keep D01 and D02 in the file because the completed view cannot show covered work.
Attach the photos to a written record
Use the free roof inspection report DOCX to pair observed conditions with photo IDs and record access limits. Keep installation and completion shots in the same project folder with their own stage labels.
Field references: Trust Roofing’s project documentation standards and CompanyCam’s roofing photo guide.